Well Completion and Workover Operations Training in London

This course in London All cities and dates

A practical course covering completion design and equipment, perforating, sand control and stimulation, then well intervention and workover from diagnosing the problem to writing the job program.

Location
London
Date
Duration
5 days
Language
Arabic & English
Venue
5-star hotel

51.51° N 0.13° W

Dates in London

Date Language Venue Registration Price
Arabic & English 5-star hotel Registration open EUR 5,800
Arabic & English 5-star hotel Registration open EUR 5,800

Dates in other cities

In brief

Well Completion and Workover Operations is a 5-day professional training programme held in London. Next date: 25 – 29 January 2027 · London.

Duration
5 days
Upcoming dates
2
Price
EUR 5,800 per participant
Next date

The course starts from the reservoir requirements that drive completion type, then reviews the hardware from tubing, packers and subsurface safety valves up to the wellhead and Christmas tree. Participants study perforating, sand control, acid stimulation and hydraulic fracturing, followed by intervention with wireline, coiled tubing and workover units. Sessions use realistic completion schematics and well records, and participants practice writing a workover program with its operational sequence and barriers.

What you will learn

  • Draw a completion schematic for a producing well, naming components and setting depths
  • Choose a perforating method, shot density and underbalance for a given case
  • Identify the most suitable intervention method for a problem such as scale or a tubing leak
  • Write the operational sequence of a workover program including well kill and barrier verification
  • Select a completion type suited to the reservoir and the well objectives
  • Explain the function and selection criteria of each component in the completion string
  • Compare perforating, sand control and stimulation methods
  • Distinguish well intervention methods and the limits of each
  • Diagnose well problems and prepare a workover program that maintains well barriers

Skills you will develop

  • Reading and preparing completion schematics
  • Selecting completion equipment and fluids
  • Planning intervention and workover jobs
  • Assessing well barriers and integrity

Who should attend

  • Completion and workover engineers
  • Production and petroleum engineers in the field
  • Workover rig and well intervention supervisors
  • Drilling and reservoir engineers involved in well design

Well Completion and Workover Operations Course Outline

Day 1 Completion Design Basics

  1. Reservoir and production requirements that govern design, inflow performance and tubing sizing
  2. Open hole and cased hole completions; single, dual and intelligent completions
  3. Lower completions for horizontal wells: slotted liners and inflow control devices

Day 2 Completion Equipment and Fluids

  1. Tubing, permanent and retrievable packers, sliding sleeves and landing nipples
  2. Subsurface safety valve, wellhead, Christmas tree and tubing hanger
  3. Completion brines and filtration, and metallurgy selection for sour service with H2S and CO2

Day 3 Perforating, Sand Control and Stimulation

  1. Shaped charges, shot density, phasing and underbalanced perforating on wireline or TCP
  2. Sand control: gravel packs, standalone screens and frac-packs
  3. Matrix acidizing in carbonate reservoirs and the principles of hydraulic fracturing

Day 4 Well Intervention

  1. Slickline, electric line and wellhead pressure control equipment
  2. Coiled tubing and its use in cleanouts, nitrogen lifting and acid placement
  3. Fishing, scale removal and water shut-off

Day 5 Workover Planning and Applied Project

  1. Reasons for workover: tubing leaks, sustained annulus pressure and declining production
  2. Killing the well, the two-barrier principle, and pulling and rerunning the completion with a workover rig
  3. Applied workshop in which each team prepares a workover program for a well with a tubing leak and rising water cut

Training methodology

Exercises in reading and drawing completion schematics

Case studies of underperforming wells and diagnosis of the causes

Video and cutaway models of packers, safety valves and wireline tools

Final workshop writing and presenting a workover program

Certification

Participants receive a Harbor Training Center certificate of attendance on completing the course.

Requirements

Basic knowledge of drilling or production operations is recommended; no specialist software is needed.

Frequently asked questions

When does Well Completion and Workover Operations run in London?

The scheduled dates are 25 – 29 January 2027 and 26 – 30 July 2027.

How long is Well Completion and Workover Operations?

Well Completion and Workover Operations lasts 5 days.

How much does Well Completion and Workover Operations cost in London?

The fee is EUR 5,800 per participant.

Is Well Completion and Workover Operations available in other cities?

Yes. It is also scheduled in Istanbul, Dubai, Amsterdam and Online training; all dates are on the course page.

How do I register for Well Completion and Workover Operations?

Choose a date on this page and press “Register Now”, or send us an enquiry.

Can Well Completion and Workover Operations be delivered for our team?

Yes. We can run Well Completion and Workover Operations for your organisation, with the content, length and venue tailored to your team. Request a proposal from this page.

Need this course for a whole team?

We design a version for your organisation, at the place and time that suit you.

EUR 5,800 London
Register Now